Operations
Signal Optimizer
Design an optimal fixed-time plan with Webster's method, inspect delay and level of service per approach, then watch the plan run on a live junction.
Demand & geometry
Arrival flow per approach (veh/h)
veh/h
s
Webster: C₀ = (1.5L + 5) / (1 − Y), where L is total lost time and Y = Σ qᵢ/sᵢ. Greens are split in proportion to each flow ratio yᵢ. Each approach runs in its own phase.
Optimal cycle
—s
—
Flow ratio Y
—
—
Avg delay
—s/veh
—
Timing plan
Per-approach green, capacity, degree of saturation (x), Webster delay and HCM level of service
| Approach | Flow | Green | Capacity | x | Delay | LOS | Equal split delay |
|---|
Live junction
The Webster plan driving a four-arm junction · vehicles arrive at the flows above
—
Served0
Queued now0
Webster vs equal split
Average delay per approach (s/veh) at the same cycle length
Adaptive queue allocator
Split a green budget in proportion to measured queues, within min/max green limits (the controller used by FlowGrid's adaptive strategy)
veh
veh
veh
veh